1
543 435 346 45643
 

High building construction technique

กกFor the construction of the high building, our company applied many advanced construction technique. In the construction of Qingdao Holiday-in Hotel, the workmanships such as large formwork of steel frame, floor platform formwork, scaffold wholly lifted, rebar connecting, floor slab post-tension without felting pre-stressing, big span of formwork in air, concrete transfer for super-high building floor ( pumping height 153m ), big span net structure construction etc. In the construction of the office building for Tianjin Port, the high efficiency concrete techniques were adopted; they are post- casting concrete for the concrete pile, pre-cast concrete, equalizing shrinking-concrete, water- proofing concrete, HRB400 grade cold- rolling steel bar, large formwork, formwork early-dismantling system, suspending scaffold, application of water-proofing bitumen and method of hot-melting techniques. In the construction of the office building of the First Navigational Engineering Bureau, the new technique of connecting the thread-steel, large steel formwork, supporting the pile driven into the deep ground and lifting scaffold by hydraulic elevator were applied. The new technique application has played a very important role in respect of the work quality, shortening the work duration and satisfying the employee

 

 

 

Home Page
About Us
Construction Technique
Under Construction
Company Achievement
Hot News
Diagram Of Works
Contact Us